Exhibition Stand Construction
We build your stand to the approved design, install it at the venue, support it during the show and dismantle it after the fair.

From the Design to the Exhibition Hall
The first step in having a stand built is to confirm the design and dimensions it will be built to. If you already have a design, we prepare it for production; if not, we design it as well. Flooring, walls, counters, shelving and display cases are built to a schedule planned back from the fair dates.
Installation takes place on the build-up days set by the organiser. We install the stand at the venue, fit the graphics, lighting, electrical connections and screens, and hand it over before the fair opens. When the fair closes, dismantling the stand and handing back the space are our responsibility.
Our Stand Construction Services
Production Drawings
The design turned into dimensioned drawings and a materials list.
Stand Build
Flooring, walls, counters, shelving and display cases.
Graphics and Print
Wall graphics, logos and product images.
Electrics and Lighting
Lighting, sockets and screen connections to the venue’s electrical rules.
On Site Installation
Assembly on the build-up days, final checks and handover before opening.
Dismantling
Breaking down the stand after the fair and handing back the space.
From Our Stand Projects
Contact
Send us the details of your event by email or call us.